Thank you for your interest in this Virtual Open House. The Virtual Open House and comment period ended February 15, 2021.
Project Overview
The Oklahoma Department of Transportation (ODOT), in cooperation with the Federal Highway Administration (FHWA), is proposing roadway and bridge improvements on SH-9 from the Pecan Creek Bridge approximately 5.5 miles to the SH-102 intersection.
The purpose and need for this project is to improve both safety and traffic flow along this segment of SH-9. The existing SH-9 highway is a two-lane facility with 8-foot-wide shoulders and has higher-than-average commuter traffic. The current (2019) traffic on the segment west of the SH-9/SH-102 intersection is 5,130 vehicles per day (vpd) with a 2039 projected traffic of 7,180 vpd. These next phases of planned improvements to SH-9 are a continuation of an ODOT commitment to improve this heavily used route.
The proposed improvements consists of providing four (4) 12-foot-wide driving lanes with a 14-foot-wide center left-turn lane and 10-foot-wide paved shoulders. Bridges will be replaced at Bullfrog Creek and Jim Creek. Intersection improvements are planned with SH-9 at NS-330 to correct the skewed intersection.